50MW Solar Farm Development
Phase 1 of a 200MW Green Energy Project
Our company is developing a 200 MW solar energy project, with the first 50 MW phase set for grid connection in Q2 2026. This initiative supports the expansion of renewable energy capacity and contributes to reducing fossil fuel dependence.
Project Scope and Development Plan
- The solar farms will be installed across 5 separate plots, covering 400 hectares in the Cádiz and Málaga regions.
- Partial energy storage systems will be integrated into the farms to enhance grid stability and optimize energy distribution.
- Applications have been submitted for multiple grid connection points, ensuring efficient power transmission.
- Energy Production and Future Expansion
- Phase 1: 50MW to be operational by Q2 2026.
- Full project capacity: 200MW, developed in 4 phases.
- Contributing to Spain’s renewable energy strategy by providing clean, sustainable electricity and improving grid reliability through storage solutions.
By implementing energy storage capabilities alongside large-scale solar generation, this project strengthens Spain’s renewable energy infrastructure while advancing long-term sustainability goals.